Case Studies

Dumaresq Dam, Armidale

We were approached by one of our clients Leed Engineering to design scaffold access along the top of Dumaresq Dam for 1 in 10,000-year flood rectification work for the Armidale Council. Requirements of the Scaffolding: To be able to work from the

Farley Waste Water Treatment Plant

Our client, Building Projects, required scaffold to several buildings and tanks on the site. This included full perimeter scaffolding and internal birdcage scaffolding (like a big stage floor). The purpose of the scaffolding was for blockwork, soffits and installing the

Burren Junction Silos

GrainCorp required internal scaffolding for silos 2 and 3 to complete rectification works on grain chutes and towers. The project had several challenges including the confined space for the internal silo works which included over 60 tonnes of scaffolding to

Our Lady of the Rosary Catholic Church

Thomas Scaffolding were contacted by local stonemason J & J Edstein to provide a creative and dynamic scaffolding solution for the cross restoration of the Our Lady of the Rosary Catholic Church.